University Heights

Toronto

Quick Summary

Location:
1275 Finch Avenue W 
City:
Toronto 
Cross Section:
 
Price Range:
 
Floors:
 
Maintenance Fees
 
Status
Pre-Construction 
Parking:
Underground parking with 390 spaces 

Property Description

University Heights Professional Centre is an 8 story, 160,000 sq. ft. commercial development that comprises of retail space on the lower levels and professional offices on the upper levels. Strategically located at 1275 Finch Avenue West. Across the street from the new Finch West TTC subway station which is scheduled for completion in 2015. This project is leading the way in the regeneration of the Downsview Corridor.

In answer to increased demand for commercial real estate, the University Heights Professional Centre is strategically located at 1275 Finch Avenue West. In close proximity to Yorkdale Shopping Centre, the new Humber River Regional Hospital, Downsview Park, York University and most notably the new Finch West TTC subway and LRT station – scheduled for completion in 2016 and 2020, respectively – this project is leading regeneration in the Downsview Corridor.

This new 8-storey, 160,000-square foot commercial building is an excellent investment opportunity that will comprise retail space on its lower levels with professional offices on the upper levels. Leasing and sales are underway. Contemporary and distinguished design – each spacious unit exudes an atmosphere of professionalism and care. Presented as a modern, turnkey solution to office build-out, University Heights was conceived with professional occupancy in mind – the means are on hand.

Office Highlights
89 units
550 to 2,500+ square foot units
Balconies on select north-facing units
Each unit enjoys a full suite of amenities, with dedicated kitchen, bathroom and boardroom space
Full interior design consultation and decoration offered by Ambience Design Group. A streamlined approach to build-out and occupancy, the service combines tailored floor plans, colour schemes, materials and furnishing selections
Sustainability/Efficiency
Intent on creating an environmentally sound structure, the University Heights Professional Centre was built to Toronto Green Standard Tier 2 qualifications. Using high-reflecting materials, energy efficient controls and low impact mechanical fixtures was an essential way to reflect the lush indigenous landscaping surrounding
the property. UH was built to last and serve the long-term needs of its tenants and patrons. An open and sun-lit commercial concourse dedicated to restaurant and retail tenants is serves ample space for seating and strolling. Street-level entrances to all commercial units provide commercial frontage on much-traveled Finch Ave. W.

From 550 to over 2,500 square feet
Tim Hortons drive-thru restaurant
7000+ square foot open-air green roof accessible from floor 3
Three-storey underground parking with 390 spaces
Steps from the new Finch West Station, in service by fall 2016

Finch West Station | Toronto-York-Spadina Subway Extension
Schedule completion: Fall 2016
Will include a bus terminal on the east side of Keele Street, north of Finch Avenue West.
The Finch West LRT from Finch West subway station to Humber College Work will begin in 2015
Station complete and in service by 2020
Forecasted ridership is 2,800 pphpd (passengers per hour per direction)
Car Traffic
43,094 AADT* = Finch east of Keele
36,502 AADT = Finch west of Keele
37,299 AADT = Keele north of Finch
38,388 AADT = Keele south of Finch
*AADT (annual average daily traffic)

Building Rendering

Floor Plans and Prices

Map